Stema Engineering A/S - Denmark

Stema was suffering from a serious lack of space in the storage warehouse. The room was stuffed with pallet racks making picking/storing ineffective due to long walking distances.

The storage warehouse not only delivers components to current assembly tasks but is also picking components and parts for sales and service jobs. Each day components are sent and received which implies a high level of activity in the warehouse.

Solution:

The TORNADO is placed in the production warehouse, against the wall to the storage warehouse. In this wall an opening has been cut, which corresponds the measurements of the TORNADO picking opening. However, the TORNADO could equally have been placed outside the building. This would have allowed a machine with twice the height (=15 meters).

The TORNADO machine only takes up 13 sqm and contains all the parts which originally took up 170 sqm.

The TORNADO has reduced picking times and improved the handling of orders.

The TORNADO is placed in the production warehouse, against the wall to the storage warehouse. In this wall an opening has been cut, which corresponds the measurements of the TORNADO picking opening. However, the TORNADO could equally have been placed outside the building. This would have allowed a machine with twice the height (=15 meters).

The TORNADO machine only takes up 13 sqm and contains all the parts which originally took up 170 sqm.

The TORNADO has reduced picking times and improved the handling of orders.

Capacities:

Height of Tornado: 7,5 meter
Tray width: 4 meters
No. of trays: 65
Floor space used: 13 sqm